How the tube hydralic clamps should be installed
Installation on the welding plate Before installation, in order to determine the direction of the clamp very well, it is advisable to first make a good symbol at the fixing place, then weld on the welding, embed the lower half of the pipe clamp body and put on the pipe to be fixed. Then put on the other half of the tube clamp body and cover plate, tighten with screws. Do not weld directly the bottom plate which has been fitted with a pipe clamp.
On the ground rail, the rail can be welded to the base or fixed with screws, then push the rail nut into the rail and turn 90 degrees, embed the lower half of the pipe clamp body into the nut, put on the pipe to be fixed, then put on the upper half of the pipe clamp body and cover plate, and fix with screws.
Stack up the device, the rail can be welded on the foundation or fixed with screws, first install the upper and lower half of the pipe clamp body, put on the tube to be fixed and then put on the upper half of the pipe clamp body, fixed with screws, after the anti-loosening cover plate to avoid its transformation. Then install the second pipe clamps, the same approach as above.
The installation of the bend, the installation of the bend, should be fixed directly in the front and rear of the bend with the Sturdy pipe clamps. It is recommended that such a support point should be a fixed position.






