Hydraulic piping flushing requirements
Before pipeline installation and construction, the pipeline should be pickled to remove oxides and impurities.
After construction, pickling, degreasing, passivation and neutralization of the entire pipeline can be carried out according to the site. Conditions are carried out offline and online. In general, new pump source and online circulation are adopted. Use four-in-one cleaning solution for pipeline cleaning.
Pipeline flushing should be carried out continuously by means of online circulation.
≥1.5 m/s.
After the pipeline treatment is completed, the pipeline is circulated and flushed to completely remove the debris in the pipe.